Transmission System Integration for 500 GW RE

– July 23, 2024

The report portrays the broad transmission system roadmap for reliable integration of 537 GW RE capacity by the year 2030.

📄 Download

File Type: PDF

File Size: 3 MB

Categories: Country, E-Resource, Grid Connectivity, India, New and renewable energy, Research and Analysis, Theme, View_All_Library_Docs, XDocument_Type