BIMSTEC Energy Centre

CERC (Terms and Conditions of Tariff) Regulations, 2024

Terms and conditions for determination of tariff, for all cases where tariff for a generating station or a unit thereof and a transmission system or an element thereof is required to be determined by the Commission under section 62 of the Act read with section 79.

Load Generation Balance Report 2024-25

The Load Generation Balance Report (LGBR) 2024-25 outlines the assessment of the Anticipated Power Supply Position in the country for the year 2024-25.

Get In Touch

BIMSTEC Energy Centre, Swayambhu Hall Building, CPRI Campus, Prof. Sir. C.V.Raman Road, Sadashivnagar PO, Bengaluru, Karnataka-560080, India

bimstecenergycentre@gmail.com

+91-80-22072308

Follow Us

Total Visitors : 1201

© BIMSTEC Energy Centre . All Rights Reserved.