BIMSTEC Energy Centre

Transmission System Development Plan of Nepal

– July 30, 2024

The Transmission System Master Plan is a comprehensive transmission system development plan for the period of 2015 to 2035. It presents the clustering of hydropowers to evacuate power along the river corridor in an optimal way and presents a reliable network for the power export.

📄 Download

File Type: PDF

File Size: 7 MB

Categories: Country, Data Management, E-Resource, Energy security and trade, Grid Connectivity, Hydropower, Nepal, Research and Analysis, Theme, View_All_Library_Docs, XDocument_Type

Get In Touch

BIMSTEC Energy Centre, Swayambhu Hall Building, CPRI Campus, Prof. Sir. C.V.Raman Road, Sadashivnagar PO, Bengaluru, Karnataka-560080, India

bimstecenergycentre@gmail.com

+91-80-22072308

Follow Us

Total Visitors : 1201

© BIMSTEC Energy Centre . All Rights Reserved.